Make sure the outer edge extends over the gutter.
Where is drip edge installed on roof.
The correct placement of a roof drip edge is on top of the roof s exterior cover directly between the sheathing and the fascia board which forms a drainage gap between the drip edge and the fascia board.
If it doesn t pull the drip edge out slightly from under the shingles.
Rake edges should also get metal edging but it is just not as critical.
Learn more about drip edge at.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
Drip edging is a strip of flashing that is applied to the edge of roofing prior to the installation of other items.
It is designed to protect the roof s sheathing from water damage caused by rain snow or ice being blown or rolling back beneath the edge of the shingles.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Drip edge roof flashing types.
Obviously the most critical location for drip metal is precisely at the site of the majority of drips the eaves.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
It is also sometimes called d metal for drip.
How to install a drip edge.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Gaf mastering the roof chapter 05 the drip edge is critical to provide a finished look and to add waterproofing.
And the installation sequence of the edge metal with the felt underlayment is optional in most manufacturers printed instructions.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
This lets any water that gets on the roof run down the underlayment and over the drip edge.